The Syringe Line production suite project includes the complete construction of interior Clean Room Aseptic Suites as well as the exterior utility yard. Design Assist was required for completion of the project from the 60% drawings available at bid time. JBH completed the mechanical and process piping scope for both the interior spaces and exterior utility yard including installation of the following processes systems: Nitrogen, Chilled Water, Clean Steam Condensate, Heating Hot Water, Duct System for air handlers and exhaust, High Pressure System, Pump Condensate, Water for Injection (WFI), Reverse Osmosis (RO) water, fire protection system (subcontractor). All process and systems were modeled prior to fabrication and installation and all BIM files remained accessible to CM throughout project for integration into their federated model.
JBH served as prime mechanical and process-piping contractor during the design-assist and construction portions of the project.
Project named Best Building 2019 for Outstanding Specialty Work by the Associated General Contractors NM Building Branch.
Project Manager Perspective from Best Buildings Awards program: