This project consisted of two (2) projects running simultaneously at Los Alamos National Laboratories. Tank Replacement: The scope of the Tank Replacement was the installation of lift stations at two different locations. Both Lift Stations were in close proximity to existing structures and both were located among multiple existing utilities. Both Lift Stations required the installation of 12’ diameter corrugated pipe standing vertical at a depth of over 20’ below grade. Coordination with Facility Management was a must for location of utilities, scheduling production around line beam usage, traffic control, and staging of materials in numerous locations. The scope of the Treatment Facility was the construction of the Treatment Facility 20’ below grade, consisting of Storage Area #3 – 150,000 radioactive resistant tanks, pump areas and aeration ponds. Utilities had to be brought to the site from over ½ mile requiring coordination with Facility Management for extensive traffic control.